SITEK | Projects
Site Map
Home
About
Products and Services
Engineering
Procurement
Construction
Mechanical completion and commissioning
Maintenance
Trainings
Projects
Teniz
HSEQ
Career
News
Contact
x
English
Қазақша
Русский
+7 712 227 2072
+7 712 227 2062
info@sitekcaspian.com
Home
About
Products and Services
Engineering
Procurement
Construction
Mechanical completion and commissioning
Maintenance
Process and Specialty Services
Projects
HSEQ
Career
News
Contact
Our Projects
Home
Our Projects
Type of work
Show all
Maintenance
Procurement
Mechanical Completion and Commissioning
Construction
Process and Specialty Services
Engineering
Year
Show all
2011
2012
2013
2014
2015
2016
2017
2018
2019
Ongoing
Castoro12 and Castoro16 refurbishment barge
Final client:
SAIPEM
Work period:
2012-2013
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Execution of Electrical аnd Instrumentation works (lighting, power, heat tracing, F&G, telecomm. Etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning.
Zhambyl Submersible Drilling Barge
Final client:
DSME
Work period:
2011-2012
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Execution of Electrical and Instrumentation works (lighting, power, heat tracing, F&G, telecomm, etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning.
New Wellhead Area K&L Line
Final client:
MAERSK
Main contractor:
KCOI
Execution of Electrical And Instrumentation works (lighting, power , heat tracing, Instrument installation hook-up ,pneumatic and hydraulic tubing laying and connection, VSD control panel and RTU system, etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning
MAERSK New Pig Trap Skid
Final client:
MAERSK
Work period:
2013
Location:
Dunga Oil Field, Akshukur Fabrication Yard
Main contractor:
KCOI
Execution of Electrical And Instrumentation works (lighting, power , heat tracing, Instrument installation hook-up ,pneumatic and hydraulic tubing laying and connection, VSD control panel and RTU system, etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning
JackUp Drilling Rig Satti
Final client:
KMG Drilling & Services
Work period:
2013-2015
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Execution of Electrical and Instrumentation works (lighting, power, heat tracing, F&G, telecomm, PAGA, SCADA, Instrument hook up, pneumatic & hydraulic lines, FOC, TVSAT,) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning
Karabatan On-shore facilities - ECP maintenance phase 1
Final client:
NCOC
Main contractor:
ERSAI
Execution of Electrical cathodic protection system maintenance, supervision of OPF site equipment providing measurement checks and corrective action in case of failure. Dismantling of equipment out of service, refurbishment and reinstallation.
Karabatan On-shore facilities - ECP maintenance phase 1
Final client:
NCOC
Work period:
2012-2013
Location:
Karabatan OPF Sites
Main contractor:
DIETSMANN
Execution of Electrical cathodic protection system maintenance, supervision of OPF site equipment providing measurement checks and corrective action in case of failure. Dismantling of equipment out of service, refurbishment and reinstallation.
Karabatan On-shore facilities - ECP maintenance 2nd phase
Final client:
NCOC
Work period:
2013-Ongoing
Location:
Karabatan
Main contractor:
ERSAI
Execution of Electrical cathodic protection system maintenance, supervision of all site equipment providing measurement checks and corrective action in case of failure. Dismantling of equipment out of service, refurbishment and reinstallation.
Karabatan On-shore facilities - FG3 fuel gas pipeline ECP REFURBISHMENT
Final client:
Agip KCO
Work period:
2012
Location:
Karabatan
Main contractor:
TKA LLP
Execution of Electrical cathodic protection system design with specifications and installation
Karabatan Sour Oil&Gas Pipeline - new EPC and AGI’s valves Installation
Final client:
NCOC
Work period:
2015-2016
Location:
Karabatan
Main contractor:
Bonatti
Execution of Electrical and Instrumentation and Cathodic Protection system supply and installation, commissioning of the Cathodic Protection system.
Karabatan On-shore facilities-IECEX equipment & metering equipment maintenance
Final client:
NCOC
Work period:
2014-Ongoing
Location:
Karabatan
Main contractor:
ERSAI
Execution of IECEX/ATEX Electrical system maintenance, supervision of all site equipment providing measurement checks and corrective action in case of failure. Dismantling of equipment out of service, refurbishment and reinstallation
Kashagan Project “D-Island”
Final client:
Agip KCO
Work period:
2012
Location:
D Island, Kashagan
Main contractor:
Tozzi Kazakhstan
Execution of Electrical and Instrumentation works (lighting, power, heat tracing, F&G, telecomm. Etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning.
Kashagan Project “D-Island”
Final client:
Agip KCO
Work period:
2012-2013
Location:
D Island, Kashagan
Main contractor:
KCOI
Mechanical completion for E&I systems.
Kashagan OFF-shore facilities- HVAC maintenance
Final client:
NCOC
Work period:
2014-Ongoing
Location:
Kashagan
Main contractor:
ERSAI
Execution of HVAC system maintenance, supervision of all site equipment providing measurement checks and corrective action in case of failure. Dismantling of equipment out of service, refurbishment and reinstallation.
KCOI New Pig Trap Skid
Final client:
NCOC
Work period:
2012
Location:
Kashagan
Main contractor:
KCOI
Execution of Electrical And Instrumentation works (lighting, power, heat tracing, Instrument installation hook-up, etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning.
KCOI – Maersk P202-A/B Pumps and V-301 ESDV Field Modification – Shut Down
Final client:
Maersk
Work period:
2015-2016
Location:
Dunga Oil Field
Main contractor:
KCOI
Execution of Electrical and Instrumentation installation for the planned shut-down activities in Dunga Field. Procurement of secondary items and consumables.
KSS BBSH pipeline ECP system
Final client:
KazStroyService
Work period:
2013
Location:
Along pipeline
Main contractor:
Alphacenter
Execution of cathodic protection polarization test, native potential soil, CIPS, DCVG, and Cathodic protection system Commissioning
TCO – 10 KVA PACKAGED SUBSTATION
Final client:
KCOI
Work period:
2016
Location:
Akshukur Fabrication Yard
Main contractor:
Skema
Reassembly of Electrical & Instrumentation, HVAC, F&G equipment, cabling, connection, testing, FAT in assistance to Skema OEM for 10 KVA LER; final dis-assembly and re-packing for delivery to Tengiz. MC and Punch List clear out, Pre-commissioning and commissioning
Eskene West Railway Project
Final client:
NCOC
Work period:
2016-2017
Location:
Karabatan
Main contractor:
ISKER
Execution of Electrical and Instrumentation installation works, MC and Punch List clear out, Pre-commissioning and commissioning
TENGIZ LCR HVAC engineering & installation supervision
Final client:
TCO
Work period:
2014-Ongoing
Location:
Tengiz Oil Field, KTL
Main contractor:
TCO
Execution of HVAC engineering, and Supervision to Installation works for refurbished LCR KTL room
NCOC - EPC 2&3 Kashagan Field – E&I installation
Final client:
NCOC
Work period:
2015-2016
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Execution of Electrical and Instrumentation installation works, MC and Punch List clear out, Pre-commissioning and commissioning
TCO Water Tank Electrical Cathodic Protection
Final client:
TCO
Work period:
2017
Location:
Tengiz Oil Field
Main contractor:
GATE
Execution of Electrical cathodic protection system design, issue of technical data sheet, site report, method statement, detailed engineering, installation
ERSAI Kuryk Yard – Jetty ECP Electrical Cathodic protection design
Final client:
ERSAI
Work period:
2017
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Execution of Electrical cathodic protection system design, issue of technical data sheet, site report, method statement, detailed engineering, installation
ERSAI – ELECTRICAL NETWORK 110 kV UPGRADE
Final client:
ERSAI
Work period:
2017-2018
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Upgrade of existing receiving substation from 10kV to 110kV including ENGINEERING, PURCHASE, INSTALLATION of the following main equipments: -Transformers 110/10 kV P=16000 kVA (n. 2) -High Voltage Gas insulated circuit breakers -Relay protection and automations for HV substation with SEPAM Microprocessor units -SCADA and ASCAPC for remote monitoring and control of HV equipments and automated power metering -Transformer 10/0,4 kV P=1600 kVA -Extension of existing LV Switchgear -Commissioning and Start-up of HV Substation
ISKER – EPC2 Hook Up
Final client:
ISKER
Work period:
2017-2018
Location:
Offshore Caspian Sea
Main contractor:
ISKER
Well-head module EPC2 Execution of Electrical and Instrumentation installation works, MC and Punch List clear out, Pre-commissioning and commissioning assistance
ERSAI – TCO Pre Assembled Rack (PAR)
Final client:
TCO
Work period:
2017-2020
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Electrical, Instrumentation and Telecommunication System installation, check and Mechanical Completion. Execution of GAP Engineering for the E&I Activities.
RENCO – TCO Prorva CaTro Temporary Camp construction
Final client:
TCO
Work period:
2017-2018
Location:
Prorva, Tengiz Oil Field
Main contractor:
RENCO
Electrical, Instrumentation and Telecommunication System installation, check and Mechanical Completion. Execution of Third Party consultant for earthing and Electrical system requirements
ERSAI – NCOC Pipeline Cathodic Protection Survey (CIPS and DCVG)
Final client:
NCOC
Work period:
2017
Location:
Karabatan
Main contractor:
ERSAI
Survey of 80 km Pipeline performing Cathodic Protection Test: DCVG (Direct Current Voltage Gauge);CIPS (Close Interval Potential Survey). The Scope of Work includes the reporting of the finding. The activities have been performed by qualified NACE Personnel.
SKEMA – TCO Supervision on Installation and Commissioning of LER for FGP Project
Final client:
TCO
Work period:
2018
Location:
Tengiz Oil Field
Main contractor:
Skema
Supervision on installation activities, performed by Contractor of TCO. Verification of correct installation and proper set-up of equipment. Commissioning of all systems, including High Voltage.
ERSAI – TCO Pre Assembled Rack (PAR) Hook up in Tengiz 3GP
Final client:
TCO
Work period:
2018-2020
Location:
Tengiz Oil Field
Main contractor:
ERSAI
TCO - E&I Work & Temporary Electrical Facilities Installation. Electrical, Instrumentation and Telecommunication System installation, check and Mechanical Completion. Execution of GAP Engineering for the E&I Activities
KCOI – Well Conversion Project (Slow Down) at D-Island
Final client:
NCOC
Work period:
2018-Ongoing
Location:
Offshore Caspian Sea
Main contractor:
KCOI
Removal of existing and Installation of New Electrical, Instrumentation and Telecommunication System. Work Pre-fabrication onshore, installation offshore
GATE – Full commissioning of E&I, HVAC, F&G in Substations 3302/3310. The scope includes supply of Manpower, equipment, test sheets close out
Final client:
TCO
Work period:
2018-2019
Location:
Tengiz Oil Field
Main contractor:
GATE
- 10kV SF6 Switchgear (GIS) - Dry Type Transformers - 0.38kV Motor Control Centers (MCC's) - 0.38kV Load Distributions Boards - Control Panel for 10kV GIS - Alarm Annunciator Panel - 220VDC UPS Panel - 220VDC Distribution Board - Fire Alarm Panel & Detection System. - Gas Alarm Panel & Detection System. - HVAC Systems - HVAC Control Panel
Bonatti - Installation & Pre-commissioning of Temporary and Permanent Cathodic Protection on the area 51 Pipelines FGP project
Final client:
TCO
Work period:
2018-Ongoing
Location:
Tengiz Oil Field
Main contractor:
Bonatti
The Scope of Work includes provision of manpower, equipment and Test instruments. Pin brazing operator has been successfully qualified on PQT test on Client pipelines. Protection Test:DCVG (Direct Current Voltage Gauge);CIPS (Close Interval Potential Survey).
ERSAI – NCOC 2019 Turn Around E&I Activities
Final client:
NCOC
Work period:
2018-2019
Location:
Onshore Karabatan And Offshore Kashagan, Caspian Sea
Main contractor:
ERSAI
Installation of Electrical and Instrumentation Equipment, Maintenance Activities, EX Inspections, Electrical Equipment Inspection, Installation and removal of Heat Tracing, Instrument Calibration, Testing and Pre-commissioning and Start-up assistance. Activities are both for Onshore and Offshore
Remote Instrument Enclosures (RIE)
Final client:
TCO
Work period:
2018-2019
Location:
Akshukur Fabrication Yard
Main contractor:
KCOI
Installation of Electrical, Instrument and Telecom equipment, cable tray and MCT, cable laying, dressing, tagging, connection, and termination. Lighting and small power, grounding and earthing, FM 200 system, and Mechanical Completion
Multi Well Pad (MWP) Cathodic Protection Installation and Testing
Final client:
TCO
Work period:
2018-Ongoing
Location:
Tengiz Oil Field
Main contractor:
GATE
Installation of Cathodic Protection System, pin-brazing, ground-bed, cable connection, earth testing, and Mechanical Completion.
EPC 4 Fabrication – Mechanical Completion and Commissioning Support
Final client:
NCOC
Work period:
2018-Ongoing
Location:
Akshukur Fabrication Yard
Main contractor:
KCOI
Mechanical Completion service, Planning, Coordination of the QAQC Activities, Punchlist closeout, ITR Preparation and sign off. Commissioning Supervision and execution.
EPC 4 Hook Up
Final client:
NCOC
Work period:
2019
Location:
Offshore Caspian Sea
Main contractor:
ISKER
Electrical, Instrumental, Telecommunication works installation and Mechanical Completion. Commissioning Assistance.
Ferrochrome Plant Conveyor Refurbishment
Final client:
ERG
Work period:
2019
Location:
Aktobe ERG Ferrochrome plant
Main contractor:
ERG
Design of new bunker wall for th Furnace of the plant “Aktobe Ferochrome Plant”.
TCO ACHE/PAU Pipe Cleaning – HP Water Jetting Services
Final client:
TCO
Work period:
2019
Location:
Kuryk Fabrication Yard
Main contractor:
ERSAI
Provision of Pipe Cleaning for PAU Spools; HP Water Jetting with application of CORTEC VpCI 414; Spools internal Corrosion Cleaning
Pipeline Cleaning HP Water Jetting Services Pipeline Camera Inspection
Final client:
Nostrum Oil & Gas (Zhaikmunai LLP)
Work period:
2019
Location:
Chinarevo Oil Field
Main contractor:
Nostrum Oil & Gas (Zhaikmunai LLP)
Provision on cleaning of suction piping at 3800 A/B/C Compressors CGTU-3 Construction project with application of Citric Acid. Cleaning of pipelines from 6” to 24”. Perform a camera (borescope) line inspection after cleaning
Feasibility Study for Combined Heat and Power Generation Plant
Final client:
ERG
Work period:
2019-Ongoing
Location:
Shymkent
Main contractor:
ERG
Development of Feasibility Study in accordance with RoK Standards, to select the best configuration for a Combined Heat and Power Plant with installed capacity of 400 – 550 MW and 250 Gcal/h, gas fueled
Electrical Maintenance and Turnaround Service
Final client:
NCOC
Work period:
2019-Ongoing
Location:
Karabatan and Offshore Caspian Sea
Main contractor:
NCOC
Sole vendor for Electrical, Cathodic Protection, HVAC, Electrical Technical Laboratory for the Onshore and Offshore NCOC Facilities. The scope of supply includes the Steady-maintenance and the Turn around / Shutdown, for both Onshore and Offshore facilities.
Hydrostatic Testing of Hydraulic System Tubing at Multi-Well Pads. Tubing Hydro-testing Services
Final client:
TCO
Work period:
2019-Ongoing
Location:
Tengiz Oil Field
Main contractor:
GATE
1000 bar pressure test, and above, for Well Head tubing of Tengiz TCO (Chevron) Oilfield
Flushing, Cleaning, Filtration of Heat Agent System Lines at CGTU-3
Final client:
Nostrum Oil & Gas (Zhaikmunai LLP)
Work period:
2019-Ongoing
Location:
Chinarevo Oil Field
Main contractor:
Nostrum Oil & Gas (Zhaikmunai LLP)
Heat Agent System lines flushing, cleaning, filtration at CGTU-3, Sediment filtration of the Hot Oil System; purification of the Heat Agent from mechanical and paraffin deposits.
NCOC EPC 2&3 Kashagan Field – E&I installation
Final client:
NCOC
Main contractor:
ERSAI
Execution of Electrical and Instrumentation installation works, MC and Punch List clear out, Pre-commissioning and commissioning
NCOC EPC 2&3 Kashagan Field – Supply of Local Equipment Room EPC
Final client:
NCOC
Main contractor:
ERSAI
Execution of multidisciplinary engineering including Structural, architectural, electrical, instrumentation, HVAC, F&G and Firefighting system. Procurement and supply of all material and HVAC, F&G, Firefighting, systems. Erection and assembly of structural parts, welding, sand blasting, painting, and insulation. Electrical and Instrumentation installation works, Installation of free issue Panels, MC and Punch List clear out, Pre-commissioning and commissioning.
P1 refuge barge refurbishment for Kashagan
Final client::
Ocean
Main contractor:
KCOI
Execution of Electrical and Instrumentation works (lighting, power, heat tracing, F&G, telecomm, etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning.
MAERSK New Wellhead Area K&L Line
Final client:
MAERSK
Work period:
2013-2014
Location:
Dunga Oil Field, Akshukur Fabrication Yard
Main contractor:
KCOI
Execution of Electrical And Instrumentation works (lighting, power, heat tracing, Instrument installation hook-up ,pneumatic and hydraulic tubing laying and connection, VSD control panel and RTU system, etc.) starting from detail documents review, installation, mechanical completion, pre-commissioning, commissioning
TMB barge
Final client:
SAIPEM
Main contractor:
ERSAI
Execution of Electrical And Instrumentation engineering, procurement of material, Installation worksworks (lighting, power, heat tracing, F&G, telecomm,etc) starting from basic documents review, mechanical completion, pre-commissioning, commissioning.
TengizChevrOil
Final client:
TCO
Main contractor:
Gate
Location: Tengiz - CC
Prefeasibility study on "Construction of CCGT unit at ShHPP of 3-Energoortalyk JSC"
Final client:
ERG Capital Projects
Scope of Work:
Determination, evaluation and development of the most optimal and efficient option for construction of the new CCGT unit with capacity of 400-550 MW at Shymkent HPP-3
Bunker Walls
Final client:
ERG Capital Projects
Scope of Work:
Design of the bunker modification and adding the rotary valve feeder to the system